Products 
 Joint Ventures 
 Research & Technology 
 Licensing 
 Polymer Search 
 Community 
 Environment 
 Health 
 Product Stewardship 
 Safety 
 Security 
 Responsible Care 
 NCX Leadership 
 Board of Directors 
 Board & Committee 
  Mandates 
 Charter Documents 
 Corporate Policies 
 Filings 
 Financial Reports 
 Stocks & Dividends 
 Analyst Coverage 
 IR Calendar 
 Regulatory Filings 
 Shareholder 
 Corporate Profile 
 Leadership 
 Locations 
 Research 
  & Technology 
 Careers 
 Legal 
 News Releases 
 Press Kit 
Plant Facilities News Room Community Careers Business Environment Health/Hygiene Safety
            Social Responsibility   Community   Joffre   Environment
Air
Noise
Water
Conservation
Waste
Soil &
Groundwater
Light
Contact Us
Back to
Joffre Home
SOIL AND GROUNDWATER PROTECTION

spill containment facility
The Joffre Site has a significant amount of above-ground equipment and various underground systems like pipelines. Product spills from equipment, tank car loading, work activities or underground systems can contaminate soil. Our primary goal with our site programs is to eliminate leaks to remove the possibility of soil and groundwater contamination.

Our Soil and Groundwater Management Program includes use of the best available technology in new facilities, operation and maintenance of facilities to prevent spills and releases and effective spill response. We also conduct timely, thorough monitoring and assessment to:

  • determine any changes in local
        groundwater quality
  • identify conditions that could indicate
        potential risks to human health or the
        environment
  • ensure appropriate actions are taken to address areas of concern.


    Some of the Elements of our Soil Program
  • conducting site-wide soil studies every five years (a requirement of our Approval from
        Alberta Environment). The fourth study (studies were done in 1994 and 1999) will be
        completed in 2004.
  • conducting ad-hoc soil studies as required

    In Alberta, two soil quality standards are utilized as guidelines for industrial facilities:

  • Alberta Tier 1 criteria developed to protect against adverse effects regardless
        of land use
  • Canadian Council of Ministers of the Environment Canadian Environmental Quality Criteria     for Industrial Sites developed specifically for application at industrial sites.


    Elements of our Groundwater Program
  • sampling and chemical analyses of groundwater from a site-wide network of 50
        compliance wells (a requirement of our Approval from Alberta Environment) and
        200 supplementary wells (additional wells used to monitor conditions in and around
        operating areas).
  • comparing groundwater analytical data to historical results, background values and
        published criteria to identify potential areas of impact.


    Soil and Groundwater Success
    During the Joffre 2000 construction, projects design enhancements were made to further reduce the potential for spills to impact the soil or groundwater. These included installation of above ground lines, secondary containment for above ground storage tanks and the use of double layer synthetic liners with monitoring capability between the lined layers in the new process ponds.

     

     


  • Home Print This Page